NASA Logo
Ocean Data Processing System

Events Monitor


The Events Monitor table below can be used to gather information on events that have taken place for a particular mission throughout its lifetime. Each event is associated with a sensor and category, with a provided start and end date of when the event occurred and completed. You can search events using the following dropdown menu below to search by a particular sensor and between a specified time frame.


Page Number 1 of 90

Search Menu

Choose One:

Select Sensor
  • MODISA
  • MODIST
  • VIIRS
  • MERIS
  • S3OLCI
  • VIIRSJ1
  • PACE Observatory
  • PACE_SPEXONE
  • PACE_OCI
  • PACE_HARP2

Start Date:

End Date:

Select as many Categories and Impact Levels:

Select Category
  • SEU Command Processor and Formatter Reset
  • Safe Mode
  • Broken Sensor
  • XTX
  • Bad Host
  • Fail Safe
  • Anomaly
  • Maneuver
  • Data Collection
  • SBC Lockup
  • General
  • Science Data Processing
  • Instrument Commissioning
  • Spacecraft Launch and Commissioning
  • Science Operations
  • Spacecraft operations
  • AWS Cloud
Select Impact
  • No Impact
  • Reduced Quality
  • No Data
  • Data Delayed

Sensor Category Impact Start Date End Date Message
PACE_HARP2 Science Operations No Impact Mar 16 2026 Mar 16 2026 Solar Calibration
PACE_SPEXONE SEU Command Processor and Formatter Reset No Data Mar 12 2026 Mar 12 2026 SPEXOne experienced a Fail Counter aggregation anomaly. The SPEXOne team reported it was potentially due to an SEU-induced ICU-FPGA problem over the SAA that corrupted the connection to the DEM SpaceWire. The instrument was recovered after an ICU power cycle and DEM comms connection restored, which supported the SPEXOne team's initial assessments. The last full science product was taken at 2026-03-12T04:31:45, and after recovery, data collection resumed at 2026-03-12T13:37:11.
PACE_HARP2 Science Operations No Impact Mar 14 2026 Mar 14 2026 Detector Alignment Calibration
PACE_HARP2 Science Operations No Impact Mar 9 2026 Mar 9 2026 Solar Calibration
PACE Anomaly Reduced Quality Mar 1 2026 Mar 2 2026 A scheduling error caused duplicate subsolar tilt changes at 00:00 Monday during the weekly ATS load transition. A 3-second orbit timing shift moved the subsolar point across the day boundary, triggering both negative (old load) and positive (new load) staggers. The toggling command resulted in aft tilt for half an orbit, causing excessive glint. The following eclipse tilt change corrected the phase.
PACE Safe Mode No Data Mar 2 2026 Mar 2 2026 PACE experience a processor reset (MBE) and entered safemode around 2026-061-05:18:23 and returned to nominal operations at 26-061-23:16:03 UTC. Science data collection resumed just after 2026-03-03T00:10:49. OCI and SPEXone lost roughly 18 hours of data, and HARP2 lost roughly 21 hours of data.
PACE_OCI Science Operations No Impact Mar 8 2026 Mar 8 2026 Deep Space Calibration
PACE_OCI Science Operations No Impact Mar 8 2026 Mar 8 2026 Lunar Calibration
PACE_SPEXONE Science Operations No Impact Mar 8 2026 Mar 8 2026 Deep Space Calibration
PACE_HARP2 Science Operations No Impact Mar 8 2026 Mar 8 2026 Lunar Calibration

Showing events 1 to 10 out of 892